From an investor! 5% of the price until 31.07.2024
SOFIA CASA real estate agency offers to your attention a complex of houses St. Nicholas the Miracle Worker in the village of Elin Pelin Station.
The complex consists of 5 terraced houses located in the center of the village of Elin Pelin Station. CAPITALIZED!! House A UPI III:
Area: 247.10m2, consists of:
First floor - living room with kitchenette and dining room, bathroom with toilet, storage room, entrance hall, garage and veranda.
Second floor - three bedrooms, two bathrooms with toilets, closet, utility room and terrace
Yard: about 330m2.
House B UPI III:
Area: 176.04m2, consists of:
First floor - living room with kitchenette and dining room, bathroom with toilet, storage room, entrance hall and veranda.
Second floor - three bedrooms, two bathrooms with toilets, closet, utility room and terrace
Yard: about 250m2.
House A UPI XI:
Area: 174.35m2, consists of:
First floor - living room with kitchenette and dining room, bathroom with toilet, storage room, entrance hall and veranda.
Second floor - three bedrooms, two bathrooms with toilets, closet, utility room and terrace
Yard: about 150m2
House B UPI XI:
Area: 179.22m2, consists of:
First floor - living room with kitchenette and dining room, bathroom with toilet, storage room, entrance hall and veranda.
Second floor - three bedrooms, two bathrooms with toilets, closet, utility room and terrace
Yard: about 150m2
House IN UPI XI:
Area: 186.94m2, consists of:
First floor - living room with kitchenette and dining room, bathroom with toilet, storage room, entrance hall and veranda.
Second floor - three bedrooms, two bathrooms with toilets, closet, utility room and terrace
Yard: about 200m2
Launch date until September 2025.
The houses are rented out in the state of putty and putty according to BDS. The yards will be fenced and divided, and each client will have a contract for the distribution of use with surveying by a surveyor, which part of the yard is his property.
Each house will have electricity, water and sewer, also a gas pipeline will be laid to the property.
30.06.2024 - built to the first slab
The street will be newly asphalted and will be used only by a small number of houses.
For more information, prices of each house and payment schemes, visit: https://sofiacasa.bg/properties/kastha-vs-gara-elin-pelin/
Log in
+ Free advert