BULGARIA SOTHEBY S INTERNATIONAL REALTY presents you a four-room apartment in a boutique residential building RATA Residence. A luxurious project with an excellent location near Simeonovsko Shosse Blvd. and the French Lyceum.
RATA Residence is realized with the highest quality of construction materials and is executed by a construction company with proven experience of over 20 years on the Bulgarian market.
PROPERTY FEATURES:
Built-up area - 124 sq.m.
Total area - 143 sq.m.
Exposure: SOUTH
DISTRIBUTION: entrance hall, separate kitchen, living room and dining room, three bedrooms, two bathrooms with toilet, two terraces of 6 sq.m. The apartment has underfloor heating.
ADVANTAGES OF THE PROPERTY:
In addition to the excellent location, RATA Residence is distinguished by remarkable architecture, high level of execution and input materials, luxuriously finished common spaces.
French windows letting in lots of light
Boutique execution, few apartments
Rehau Synego /German profile/ - triple glazing, 7-chamber joinery
KONE elevator
Peace and quiet in the area
LOCATION:
It is located at Konstantin Petkanov St. 25. Easy access to main roads (Simeonovsko Shosse Blvd. and Okolovrasten Path), transport links, Kaufland and Fantastico supermarkets. A metro station is planned at the corner of Simeonovsko Shosse Blvd. and Prof. I. Stranski St., already officially included in the PUP.
400 m to the future metro station
600 m to large supermarket chains
300 m to the French Lyceum
MORE ABOUT THE PROJECT:
A low-rise boutique building that stands out with modern design, style and elegance. Thanks to the private courtyards on the ground level, the building will be surrounded by greenery, making it attractive to live in, while not burdening the owners with high maintenance fees. High floor-to-ceiling windows allow plenty of light in all rooms. Thanks to newly built infrastructure and plans to expand the surrounding streets, the site is easily accessible from the boulevards and small neighborhood streets.
The parking spaces and garages are located on the underground level in the basement.
Heating: Connections for air conditioning + installed underfloor heating
Construction stage reached - before ACT 15
Estimated completion date of the building October / November 2024
Вход
+ Безплатна обява